‘Tama 38/2’, two buildings in located in district 5 in the declaration zone, surrounded by buildings for preservation.
In the existing building: Three floors and 15 apartments
Two new buildings will be built with a mutual wall; each building will be 6 stories tall with 31 apartments.
An underground parking lot will be built for the tenants’ comfort.
Following the contract signing of the apartment owners, detailed designs of the building have begun
Bar Orian Architects